MINERAL PROCESSING KNOWLEDGE · CRUSHING AND GRINDING
Feed size sets the reduction ratio a crusher must deliver, and with it capacity, circulating load and the power spent per tonne of product.
Technical overview. Actual process selection depends on representative ore samples, mineralogy, testwork and site conditions.
Two plants can run identical crushers and identical screens and still produce very different costs per tonne, because the rock arriving at the chamber is not the same size. Feed size is the variable most often fixed by the mine and least often discussed with the process engineer, yet it sets how much work the crusher must do, how much of that work is wasted and how often the circuit stops. It is also the cheapest variable to change, since it is decided in the pit rather than in the plant.
Technical note: The relationships described here are principles of comminution and of machine operation. They explain direction and mechanism, not magnitude, and they are not a sizing calculation or a performance guarantee. Quantifying capacity and specific energy for a given ore requires representative samples and testwork.
1. Reduction ratio is the number that shapes everything else
Every crusher is asked to turn a feed size into a product size, and the ratio between the two governs almost everything that follows. A crusher doing a modest reduction works efficiently: the chamber is full, the jaws are loaded evenly and the power drawn buys a lot of reduction. The same machine asked for a large reduction in one pass behaves differently. It runs with a tighter setting, passes less material in each stroke, and a larger share of the energy goes into sliding, attrition and noise rather than into new surface.
- Oversize feed. Lumps at or beyond the maximum feed size bridge the chamber, stop the flow and force the drive to work against a nearly static load. Capacity falls abruptly while power draw spikes, and the repair bill arrives later.
- Excess fines. A feed carrying far more fines than the chamber was designed for compacts under pressure, cushions the crushing action and can cause packing at the discharge. Energy is consumed without reducing anything that needed reducing.
- Mixed feed with no scalping. The worst case is both at once, which is what an unscreened run-of-mine feed usually looks like. Scalping ahead of the chamber is often worth more than a larger crusher.
2. Reading published capacity and power against feed size
The specification table states three things at once: the largest lump the machine accepts, the setting range it can hold and the throughput range that follows from that setting. Read together, they show how the energy cost of a stage is set before the ore even arrives.
| Duty | Model | Max. feed size (mm) | Discharge setting (mm) | Capacity (t/h) | Motor power (kW) |
|---|---|---|---|---|---|
| Primary | PE900×1200 | 750 | 95-165 | 220-450 | 132 |
| Primary | PE1000×1200 | 850 | 200-300 | 280-560 | 160 |
| Primary | PE1200×1500 | 1020 | 150-300 | 400-800 | 220 |
| Primary | PE1500×1800 | 1200 | 210-360 | 520-1100 | 280 |
| Fine | PEX250×1000 | 210 | 15-60 | 15-52 | 30 |
| Fine | PEX300×1300 | 250 | 25-60 | 30-105 | 55 |
The pattern in the upper half of the table is the one that costs money when it is ignored. As the maximum feed size rises from 750 mm on PE900×1200 to 1200 mm on PE1500×1800, motor power rises from 132 kW to 280 kW and capacity from 220-450 t/h to 520-1100 t/h. A machine that accepts larger rock is not an automatically cheaper way to break a tonne; it is bigger, because the work of breaking that rock has to come from somewhere. The lower half of the table shows the opposite trade: a fine chamber on a 30 kW motor holds a setting between 15 mm and 60 mm and passes 15-52 t/h. Both readings are as published, and the cost per tonne depends on how the two stages are arranged relative to each other.
One more reading matters for energy. Each model has a single motor power but a wide capacity range, because the range follows the setting. At the coarse end of the range the same motor spreads its output over many tonnes; at the fine end it covers far fewer. The power drawn per tonne is therefore lowest when the setting is coarse and the feed is well graded, and highest when the machine is pushed to a tight setting to compensate for a coarse feed that upstream stages failed to reduce.
3. Controlling feed size before it reaches the chamber
Because feed size is fixed upstream, the cheapest energy savings are made upstream too. The first lever is the blast: fragmentation designed around the primary crusher opening delivers fewer slabs and fewer stalls. The second is the feeder: a grizzly section that bypasses fines around the chamber keeps the crusher working on the rock that actually needs breaking, and it keeps the chamber full and stable. The third is staging: spread the reduction across a primary and a fine crusher rather than demanding the whole of it from one machine, and each stage works near the middle of its published range where power per tonne is most favourable. The fourth is screening: a vibrating screen in closed circuit returns only what is still oversize, which keeps the crusher feed narrow and the circulating load predictable.
Measurement is the part most often skipped. The nominal maximum feed size in a specification is a limit, not a description of the feed. Periodic measurement of the size distribution entering each stage turns the argument from opinion into data, and it is the only reliable way to see a stage creeping towards its tight limit as the pit deepens.
Conclusion
Feed size is the input that decides reduction ratio, and reduction ratio decides both capacity and the power spent per tonne. Oversize rock stalls the machine and spikes the load, excess fines waste energy on material that is already fine enough, and a tight setting used to compensate for poor fragmentation pushes the same motor across fewer tonnes. Spread the work across the right number of stages, scalp the feed before it enters the chamber and measure what each stage really receives. That sequence normally costs less than a larger crusher.
How LiCheng Tech can help
Share the size distribution of your mined rock, the product band each stage must deliver and the tonnage you need to hold. We will review where the reduction should be split, compare the published setting and capacity ranges honestly and propose a staged circuit with the feeding and screening equipment around it.
Explore the Jaw Crusher pages, read more in the knowledge base, or send your project information.